Gas Main Replacement Project 25

CAPalo AltocityWater & Sewer
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
179999
Open Date
Jun 25, 2025
Close Date
--
Status
Closed

Description

The Gas Main Replacement Project 25 is aiming to replace approximately 25,600 linear feet of gas main pipelines with diameter of 2-inch, 4-inch, and 6-inch. The replacement includes installation of gas main pipelines under Matadero Creek and Barron Creek along Ross Road with Polyethylene (PE), natural gas service pipelines made of PVC, BWP, or undersized Polyethylene (PE), and the reconnection of natural gas service pipelines. This project was selected and awarded with a federal grant by the Department of Transporation for Natural Gas Distribution Infrastructure Safety and Modernization.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in California. 4,840 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 41868

Open Water & Sewer Bids in California

CACityOpenTODAY
On-Call Sewer System Repair Services
Santa Ana
Water & Sewer
CACityOpenTODAY
1st Avenue Water Line Replacement Project
Delano · #2026_WTR_002
Water & Sewer
CACityOpenTODAY
2026 Water Well 43 Pilot Hole And Development Project
Delano · #2026_WTR_002
Water & Sewer