This project involves full-depth pavement removal and replacement and removal and replacement of 8" water line on Silverbell Road between Congress Street and St. Mary's Road. The total length of the project is approximately 0.7 miles.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today