This project consists of the removal of 2179 SY of 8–10-inch dowelled concrete roadway, 2179 SY of 12-inch subgrade stabilization (estimated 910 tons of ¾ minus), and placement 2179 SY of 10-inch dowelled concrete roadway. The work will take place on a mixture of Collector and Residential roadways. The project cost is estimated to be between $600,000 and $650,000.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Oregon. 1,183 open bids in Oregon — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today