Furnish And Install Inserts For Siphons 1 & 3 At Globe Hollow Water Treatment Facility

CTManchestercityWater & Sewer
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
316513
Open Date
Oct 13, 2026
Close Date
--
Status
Open

Description

The Town of Manchester Water and Sewer Department is seeking a capable and reliable contractor to replace Siphon No. 1 and Siphon No. 3 at the Globe Hollow Water Treatment Plant, and to repair the associated discharge valves in the trough.Finished work shall match the repairs already completed on Siphon Nos. 2 and 4. Sequence may change due to operational needs. Both sedimentation basins that house the siphons will be drained by the Town before the start of the work. Siphon No. 1 shall be completed and returned to service first. Siphon No. 3 shall follow. The plant will remain in operation.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Connecticut. 1,438 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Oct 21, 2026 | ID: 109319269

Open Water & Sewer Bids in Connecticut

CTtownshipOpenNov 1, 2026
Bid Opening Results: Root Road Culvert Replacement Project
Coventry town
Water & Sewer
CTStateOpenNov 4, 2026
Clark Street Pump Station Force Main Replacement Project
BidNet Direct - Connecticut
Water & Sewer
CTStateOpenNov 4, 2026
MS4 Stormwater GIS Data Development Screening and Reporting Services
State of Connecticut (CTsource) · #39031
Water & Sewer
CTStateOpenNov 6, 2026
Improvements To Coppermill Road Culvert Along Goff Brook
BidNet Direct - Connecticut
Water & Sewer