This project consists of the construction of a 5-foot-wide sidewalk on the west side of Frogtown Connector from the end of the existing sidewalk north to Frogtown Road. The competition date for this project is September 1, 2024.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Kentucky. 719 open bids in Kentucky — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today