The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for the removal and replacement of twelve (12) flow meters and control systems, three (3) of which will also require the removal and installation of combined sewer overflow level sensors, and the removal and installation of seven (7) rain gauges and control systems along with technical support, support equipment, and accessories as shown and specified. Bidders are directed to Section 01010
Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,430 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today