Pinellas County Utilities (Owner) is implementing a Find and Fix program to remediate critical portions of excess Inflowand Infiltration (I&I) as part of the Capital Improvement Program (CIP). The South County I&I Remediation for PriorityAreas in the South County Zones. Zones 6, 9B, 9C, 10, 12, 14, and 15 (the Project) are listed as priority zones and willbe delivered as a Progressive Design Build (PDB), however, work in zones 1, 2, 3, 4, 5, 7, 8, 9A, 11, 13, 16 could becompleted under this Design Build agreement. The Design Criteria Package (DCP) included as Exhibit J includesobjectives and criteria for accomplishing the work contemplated by this scope. Figure 1.1 of the DCP shows the SouthCounty Zones and the Priority Areas included as part of the project. I&I studies and area evaluations have beencompleted and used to develop the design criteria for the Project’s various components. These reports, as well as otherinformation are included in Appendices to the DCP.This Project consists of the condition assessment, planning, design, and construction of gravity sewer rehabilitationwithin the priority areas. Specifically, the work will be performed in two phases. The first phase will consist of theplanning, investigation, and assessment, to be used in the development of a technical memorandum and developmentof the GMP. The second phase will consist of the include final 100% design, Issued for Construction (IFC) Documents,and the construction of the Project. Once the Phase 1 GMP is approved and notice to proceed is provided by the Owner,the final design will proceed to conformed documents and then the Contractor will perform and certify the work inaccordance with the Design Build Agreement.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today