Callaway Stadium & Field Lighting Project RFP (10/26/2023) 801 Dallis Street, LaGrange, Ga 30240 Quote/Bid #1 – New Stadium & Field Lighting System (Scope of Work): Field Lighting Level = Minimum 50FC average. Provide and install all required/necessary materials, supplies, labor, equipment, machinery, etc. for a complete lighting system, per the scope of work. Submit a photometric design layout for review and approval, prior to production and installation. All LED Lighting, submit product information for review and approval, as detailed in the photometric design/layout, prior to production and installation. Galvanized steel poles & lighting supports / cross arms, submit product information for review and approval, as detailed in the photometric design/layout, prior to production and installation. Pole mounting heights shall be designed to minimize glare and maximize playability. Base foundation, submit product information and/or engineering design for review and approval, prior to production and installation. Final lighting, aiming, and field adjustments; prior to acceptance. Provide all required permitting and engineering. Submit 811 utility locates, as required. Pre-wired system with pole mounted disconnects. Install all underground electrical circuitry to poles, as required. Fully integrated wireless communication system to allow for on-site and off-site control of the lighting system, including On/Off and dimming controls. Provide all commissioning and training for the system. Wireless modules will be factory integrated. Installation of wireless base station at location (TBD). Minimize lighting spill-over to adjacent properties, demonstrate on the photometric design layout. Minimize lighting glare for the players, spectators, and neighbors. All work shall be coordinated with Troup County Staff. Demo & remove all existing poles, pole bases/foundations, fixtures, and hardware/accessories. Provide and install emergency egress lighting for the stadium stands and surrounding areas to comply with all applicable Codes. UL Listed equipment/electronics. Comply with all applicable Building Codes, Electrical Codes, and Fire Life Safety Codes. Structural code and wind speed = 2018 IBC, 110 mi/h, and exposure: C, Importance Factor 3. Provide a copy of all manufacturer’s product warranties and the contractor’s written warranty covering all labor, installation, and workmanship.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Georgia. 2,050 open bids in Georgia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today