July 29, 2026 Monday’s storm was the latest in a season of wild and erratic weather. Hail and high winds added to the heavy downpours (Evanston received 3 inches of rain, according to some reports) that once again put the region’s stormwater management system to the test. Although the headlines weren’t as dramatic as they were after four rounds of severe storms swept through the area over the July Fourth weekend — “Deep Tunnel almost full” — by Tuesday morning, the McCook Reservoir was at 85% ca
Unlock the source link for this bid, plus email alerts when similar Water & Sewer bids open in Illinois. 2,253 open bids in Illinois — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today