4/16/2525ELE10044/30/25Jefferson PUD (JPUD) seeks a qualified electrical contractor to install EV charging infrastructure at its Operations Center, located at 310 Four Corners Road, Port Townsend, WA. The project includes the installation of three (3) dual-port Level 2 EV charging pedestals (six charging ports total) and three (3) stub-outs for future expansion. The project must be complete by May 30, 2025.The contractor shall be fully responsible for all supervision, labor, traffic control, too
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in Washington. 1,544 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today