This project proposes to connect New Milford High School with an approved sidewalk and connect existing sidewalks installed along Route 7/Danbury Road and proposes to fill in the gaps or extend the sidewalk network. The sidewalk segments proposed shall close various gaps from Pickett District Road to Still River Drive and on Aspetuck Avenue from Summit Street to the Canterbury School. Sidewalks proposals should support Transit Oriented Development.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Connecticut. 1,444 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today