The City of Meriden is seeking the services of a contractor to remove and replace approximately 4,088 sq ft of VCT flooring in SOAR hallway, gym, teacher offices, and connected side halls (as highlighted on attached drawings) at Edison Middle School.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in Connecticut. 1,449 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today