Construction of landscape and irrigation within the City right-of-way along the Redmond Central Connector Trail and other work necessary to complete the project. Engineer’s Estimate for this work is $120,000 to $150,000. Bid SubmittalClick on the link to submit your bid. Download the "City of Redmond DocuSign Bid Submission Instructions (PDF)" PDF for instructions on submitting your bid. Join Live EventClick on the link to join the bid opening. Download the "Bid Opening via Live Event Instructions" PDF for instructions on joining the event.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,357 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today