Description of Work: The driveway, parking lot and trail will be Seal Coated by the CONTRACTOR, in accordance with 2018 CALTRANS Standard Specifications, Section 37-2. See attached As-Built plan set for the Dollar Creek Shared-Use Trail. NOTES: One (1) working day estimated. The Dollar Creek Shared-Use trail seal coat excludes the pedestrian bridge concrete decking. The bridge has an H10 loading, single lane capacity. All pavement markings will be repainted after the slurry seal is appropriately
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 5,095 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today