Ditch H Trail / Sugar Land Trail Phase I

TXSugar LandcityRoads & Paving
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
250412
Open Date
Mar 26, 2026
Close Date
--
Status
Under Review

Description

The City of Sugar Land seeks bids for furnishing all labor, material, and equipment, and performing all work required for the Ditch H Trail/ Sugar land Trail Phase 1. The trail is generally located in central Sugar Land, adjacent to the Telfair District, running alongside the Ditch H Levee. This project consists of approximately 3.2 miles of 10-foot-wide multiuse trail, it generally extends from Imperial Park to Smart Financial Center. It crosses underneath Meadowcroft, HWY 6 and IH-69/59, with safety lighting hung underneath the overpasses. Ditch H/Sugar land Trail has 3 proposed pedestrian bridges, in which 2 of the bridges have pedestrian boardwalk structures. The project also includes approximately 11,050 SF of retaining wall with 2,950 LF of pedestrian railing. Trail includes one trailhead and multiple locations of wayfinding signage. The city would also like to explore options for installing glow stones, which will be seen in the bid item form under Alt 1, Alt 2, and Alt 3.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Roads & Paving bids open in Texas. 3,624 open bids in Texas — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 8, 2026 | ID: 44610903