The work covered under this contract will be performed at the Santa Cruz Wastewater TreatmentFacility (SCWWTF) located at 110 California Street, Santa Cruz, California. The project consists of thefollowing scope items:• Replacing two 12-inch digester gas header piping segments and two condensate drain lines within aconfined space (Gas Vault).• Purge, configure, operate and maintain bypass piping to allow piping demolition and replacement.• Prior to replacement of the digester gas piping, Contractor shall conduct an ultrasonic thickness testsurvey of the exposed digester gas piping from individual digesters to the gas conditioning system.• Clean up after installation is complete.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today