Design of West Side Improvements

COPueblocityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
126340
Open Date
Oct 22, 2024
Close Date
--
Status
Closed

Description

The project shall include the design, engineering, planning, drawings, plans, and consulting for Sun Mountain Boulevard from 24th Street to 31st Street (including two roundabouts). The design also includes the rehabilitation of approximately 70 bus stops to comply with ADA standards on the west side of Pueblo in Pueblo, Colorado. The southern portion of the street within the Pikes Peak Park Subdivision has been designed by NorthStar Engineering and Surveying, Inc.; the awarded Consultant must coordinate the alignment and remainder of the design. Environmental studies and NEPA document preparation will be done by a separate consultant.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Colorado. 1,083 open bids in Colorado — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 30, 2026 | ID: 3265376

Open Construction Bids in Colorado

COCountyOpenTODAY
Weatherization Manager Services
Jefferson County · #26-17614AP-FM
Construction
COStateOpenTODAY
Weatherization Manager Services
BidNet Direct - Colorado
Construction
COStateOpenTODAY
1st and D Street Affordable Housing Project
BidNet Direct - Colorado
Construction
COwater_sewerOpenTODAY
Building #2 Re-roof
Cherry Creek Valley Water and Sanitation District
Construction