The project goal consists of renovating the existing Wastewater Headworks Building for it to be adapted to the Wastewater Pretreatment Building. The project renovation includes one (1) management office space, work area for five cubicles, a cleaning and calibration work area, one (1) break room, one (1) unisex ADA accessible restroom, a conference room, and a vehicle bay the accommodates two (2) vehicles. In addition, the building requires upgrade/redesign of the mechanical and electrical systems.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Colorado. 1,083 open bids in Colorado — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today