The taxiway connectors have geometric deficiencies that do not meet the design standards per the latest FAA Advisory Circular 150/5300-13B Airport Design. Non-standard taxiway geometry will be address with this project.The existing lighting and signage systems are approximately 20 years old. The majority of the existing lighting system components were installed with the original taxiway construction project.The project elements are shown on the ALP and in the approved Airport Master Plan Capital Improvements Program.