County Road 1471, spanning from US 301 to the Bradford County line, will undergo a major rehabilitation project covering approximately 5.7 miles. The scope includes milling the existing asphalt pavement to a depth of 2.0 inches and replacing it with new 2.0-inch asphalt. Existing lane widths will be maintained throughout the corridor, except for the narrow segment at the south end—between US 301 and NE CR 1469—which is approximately 0.1 miles long and will be widened by 4 feet on the east side. Additionally, the project will upgrade all unimproved driveways and side street tie-ins within the project limits. To align with budget and funding considerations, the overall project is divided into two phases. Phase 1 extends from US 301 to NE 143rd Avenue, while Phase 2 continues from NE 143rd Avenue to the Bradford County line. Correspondingly, the project plans were developed in these phases.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today