This project for the NHBOE involves the removal and replacement of the existing cooling tower at the CO-OP School in New Haven. The NHBOE will be pre-purchasing the new cooling tower, and contractor’s scope will include the demolition of the existing tower, structural modifications, rigging, and installation of all associated piping, electrical, insulation, and controls. Due to the size of the equipment and logistics, the project will require a large crane, temporary street shutdowns, and police detail coordination.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Connecticut. 1,444 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today