Construction Stormwater General Permit Guidance

INHUNTINGTON COUNTY SOIL AND WATER CONSERVATION DISTRICTwater sewerConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

I NDIANA D EPARTMENT OF E NVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. Office of Water Quality Wetlands and Stormwater Section Construction Stormwater General Permit (CSGP) Construction/Stormwater Pollution Prevention Plan Development Guidance The Construction Stormwater General Permit (CSGP) requires the development of a Construction Plan for both the construction and post-construction phases of a project. An integral part of the Construction Plan includes a Stormwater Pollution Prevention Plan (SWP3). The SWP3 addresses several issues. First, the plan outlines how erosion and sedimentation will be managed on the project site to minimize the discharge of sediment off-site or to a water of the state. Second the plan addresses the proper management of other activities that may generate pollutants during construction. This may include disposal of building materials, management of fueling operations, etc. Finally, the plan should also address pollutants that will be associated with the post-construction land use. The SWP3 must be developed in accordance with the CSGP, and where applicable, the requirements of a local Municipal Separate Storm Sewer (MS4) ordinance. The SWP3 must be signed by a "trained individual “as defined in Appendix B in the permit. The following information is an outline of items that are required to be contained in a Construction Plan that is submitted pursuant to the CSGP. The items within this document have been divided into three distinct categories, including: (1) Construction Plan Elements (2) Erosion and Sediment Control/Project Site Management (3) Post-construction Each item is identified with a letter and number that can be directly related back to the review sheet that will be utilized by staff reviewing construction plans in accordance with the CSGP. Each item also contains information that explains the expectation for each plan element and the level to which it should be described or represented within the construction plans. Stormwater Program CSGP – Construction/Stormwater Pollution Prevention Plan Guidance March 8, 2022 Page 1 of 17 Construction Plan – General Plan Components (Section A) A1 - Index of the location of required plan elements in the construction plan: The plan index should include a list of the required items in the CSGP and where they occur in the plan. Plan preparers often have their plan index mirror items in the IDEM standard plan review checklist.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Indiana. 720 open bids in Indiana — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 12, 2026 | ID: 6264233

Open Construction Bids in Indiana

INStateOpenTODAY
Camp Atterbury Building 370 Sim Center
BidNet Direct - Indiana
Construction
INCityOpenSep 10, 2026
Concord High School Fieldhouse Building
Terre Haute
Construction
INCountyOpenSep 11, 2026
Annex Building Renovation Decatur County (Statements of Qualifications)
Decatur County
Construction