Construction Management Services Building Tour Questions – July 5, 2023 On Friday, June 30, 2023, a question was asked through email. Questions / Responses 1. Between Pre Referendum Phase and Preconstruction Phase, there was not description action required or time noted during the Referendum Phase for the Construction Manager. Should time be allotted for hours during that period, or should we include that as an extra service? If additional hours are to be included, where should we place those hours in the bid proposal form? In Pre-Referendum or Pre-Construction. There should be no services required between the Pre-Referendum Planning phase and the Design Process phase since the referendum is required to determine which Option, 1 or 2, will be designed. The CM firms may choose to use this time to better familiar themselves with the building or grounds or other needs as they see fit. If that is the case, those hours and fee should be reflected in the Pre-Construction Services section of the bid form. On Wednesday, July 5, 2023, three representatives from SiteLogic toured the North Penn High School. During the tour the following questions were asked. Questions / Responses 1. What are your biggest concerns with the project? My concerns for Option 1 is how the project would ultimately be phased and how the project would be bid. The phasing will be critical to ensure smooth construction but most of all to maintain the educational success of the High School. Because of the estimated cost and the duration of the project, how the project is bid will be critical to the success of the project. 2. What are the concerns held by the Administrative team? The Administration is concerned about the final referendum date decision and if the decision is to hold a special election in January, there is not much time to prepare a referendum campaign and strategy. 3. What level of renovation has been discussed? The existing building would most likely be a full interior demolition and reconfiguration of the spaces. 4. What type of sustainable features are being planned? The discussions have included utilizing different features throughout the building and using the building as a research and teaching tool. As an example, one idea discussed would be to design geothermal for one addition and more conventional system in another area and sub-meter the areas for comparison. 5.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Pennsylvania. 1,974 open bids in Pennsylvania — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today