As part of the pre-construction services the CMAR shall work closely with the Architect and the City. Both parties will be responsible for defining, monitoring, and maintaining the project budget and schedule. The budget is set for this project and additional funds are not available. The CMAR shall ensure adherence to the project schedule and will be responsible to provide continuous cost and constructability alternatives throughout the design and construction process. The CMAR will engage in an active role during the pre-construction services and serve as the General Contractor for the construction of the project. At the completion of the design development phase, the CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract amendment. GMP means the sum of the maximum cost of the work; the CMAR’s construction fee; general conditions fee; taxes, bonds, insurance costs; and bid contingency as proposed and approved pursuant to the CMAR Standard Terms & Conditions contained herein. The approved GMP will be made part of the Construction Services Agreement by executing an amendment or additional amendments for phased construction. The CMAR will be responsible for construction means and methods and may be required to solicit bids from pre-qualified subcontractors to perform the work. SBE Program requirements are applicable to this project. (See SBE Attachment). A. Pre-construction Phase Services by the CMAR shall include, but not be limited to the following: • Team building/partnering • Management plans • Value engineering analysis • Constructability reviews • Cost Model/Budget • Project Schedule Develop
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today