Construction Manager at Risk (CMAR) For Multiple Fire Stations

AZPrescottcityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
231216
Open Date
Jan 23, 2026
Close Date
--
Status
Closed

Description

The City of Prescott is seeking a qualified construction manager/general contractor to provide design phase assistance and construction services as the Construction Manager at Risk (CMAR) for (3) three fire stations for the Prescott Fire Department.The estimated construction cost for (3) Fire Stations is approximately $30M, including the cost for construction. It is the city’s desire to have the (3) fire stations completed before the end of 2028.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 9, 2026 | ID: 44623658

Open Construction Bids in Arizona

AZStateOpenTODAY
Fire Station 154 Relocation Construction Manager At Risk
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Relocation Architectural And Construction Administration Services
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Demolition of Six Parcels
BidNet Direct - Arizona
Construction
AZStateOpenAug 14, 2026
Fire Station No. 51 (Go Bond) Architectural Services
BidNet Direct - Arizona
Construction