Construction for Mary Ann Cleveland Way Shared-Use Path- FHWA Funded

AZTucsoncityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
74182
Open Date
Jan 3, 2024
Close Date
--
Status
Closed

Description

The Mary Ann Cleveland (MAC) Way Shared-use Path project will consist of the construction of a new off-street walking and biking path that runs adjacent to Mary Ann Cleveland Way, connecting nearby neighborhoods to Empire High school. The ten-foot-wide path will be constructed on the north side of MAC Way and will extend from Houghton Road to Atterbury Wash Way. Inherently the project will also include the construction of ADA Curb Ramps and the construction of several driveway entrances with raised crosswalks for Empire High School.This project is utilizing funds provided by the Federal Highway Administration (FHWA).  Any resulting contact will contain the FHWA required terms and conditions contained herein.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 30, 2026 | ID: 3370254

Open Construction Bids in Arizona

AZStateOpenTODAY
Fire Station 154 Relocation Construction Manager At Risk
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Relocation Architectural And Construction Administration Services
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Demolition of Six Parcels
BidNet Direct - Arizona
Construction
AZStateOpenAug 14, 2026
Fire Station No. 51 (Go Bond) Architectural Services
BidNet Direct - Arizona
Construction