College Park Drainage Improvements Phase I Construction Project

GAGlynn CountycountyConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
105490
Open Date
Jul 16, 2024
Close Date
--
Status
Closed

Description

This is an invitation to submit a bid to Glynn County Board of Commissioners for the College park Drainage Improvements Phase I Construction Project. The work to be performed under this contract consists of furnishing all labor, skill, equipment, materials and products as indicated in the plans and specifications for the installation of a double barrel 7'x4' box culvert under Altama Avenue near at Suburban Drive and SPUR 25/Golden Isles Parkway to include road side piping and other drainage improvements at this location and to also install a triple barrel 10'x4' box culvert under Cypress Mill Road at the intersection of SPUR 25/Golden Isles Parkway and ditch grading and drainage improvements along approximately 5600 linear feet of existing ditch on the south side of SPUR 25 /Golden Isle Parkway as indicated in the construction plans and specifications attached herein. The work will contain, but is not limited to, traffic control to include lane closures, clearing and grubbing, borrow, grading, dewatering, backfilling , grassing, storm drain and box culvert installation, potential water and sewer relocations, base/paving, and erosion control. All work shall be in accordance with the Technical Specifications, Special Provisions and the Construction Drawings.  All material shall conform to the specifications contained in the Technical Specifications.This is a Section 3 Covered Contract. Section 3 Business Concerns are encouraged to apply.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Georgia. 2,050 open bids in Georgia — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 7, 2026 | ID: 43743510