CMAR for Fire Station 3

AZTucsoncityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
143437
Open Date
Jan 28, 2025
Close Date
--
Status
Closed

Description

This project involves (3) major phases including: Phase 1 - construct a temporary Fire Station 3 to conduct firefighting operations from during new construction. Phase 2 - demolish existing Fire Station 3 and construct a new Fire Station. Phase 3 - demolish temporary Fire Station 3 and return site to pre-construction conditions. The project is currently in design and permitting status. Design development drawings are attached to this solicitation to provide better understanding of project requirements.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Arizona. 937 open bids in Arizona — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 30, 2026 | ID: 3370138

Open Construction Bids in Arizona

AZStateOpenTODAY
Fire Station 154 Relocation Construction Manager At Risk
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Relocation Architectural And Construction Administration Services
BidNet Direct - Arizona
Construction
AZStateOpenTODAY
Demolition of Six Parcels
BidNet Direct - Arizona
Construction
AZStateOpenAug 14, 2026
Fire Station No. 51 (Go Bond) Architectural Services
BidNet Direct - Arizona
Construction