Classical High School-Campus Electrical Upgrades Addendum 3

RICity of ProvidencecountyFacilities & Maintenance
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
--
Open Date
--
Close Date
--
Status
Open

Description

Procurement #: 54501 CITY OF PROVIDENCE, RHODE ISLAND Department: Public Property RFP Title: Classical High School Campus Electrical Upgrades. Opening Date: 8 Oct 2026 Addendum #: 3 Issuing Date: 8 Oct 2026 The purpose of this addendum is to clarify additional scope and answer questions from interested vendors Providence City Hall 25 Dorrance Street Providence, RI 02903 42 Weybosset Street | Suite 403 | Providence, RI 02903 Phone 401.648.0884 | Fax 401.331.0923 | studiojaed.com Addendum #3 Addendum Date: October 7, 2026 Project: Classical High School 770 Westminster St., Providence, RI 02903 Campus Electrical Upgrades The work herein shall be considered part of the bid documents for the referenced project and carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Acknowledge receipt of addendum on the bid form as indicated. Clarifications: 1. Additional scope of work will include hazardous material abatement. See attached Asbestos Abatement Plan #280905 – Amendment #1. 2. Additional scope of work will include replacing two sets of double doors in Building 2. See attached Sketch SK.E-103. 3. Contractor to own complete demolition and removal of legacy pneumatic control system adjacent to the tank that is being removed in the lower level of the Building 1. 4. Abatement and removal of all hazardous material identified in the Emery Abatement Reports is to be included in the bid. Questions: 1. 2. Can work be performed second shift (or during school vacation periods) while school is in session? - i.e. the conduit rough-in work associated with refeeding the 120/208V switchboard in Bld 2? If so, please advise which items in the Contractor's scope - if any are able to be performed during 2nd shift hours and during school vacation periods while school is in session. A. Yes, work can be performed second shift or when school is not in session. Any work intended to be completed during the school day / school year is to be completed second shift. The switchgear manhole by Building H is a separate location and is not on the one-line. Please confirm the contractor is to provide the manhole, grounds, bollards, and two 4 in. primary conduits to each transformer, and confirm that HV cable, terminations, the utility switch, and any feeder from the manhole to the Building 2 transformer are not in this contract. A.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in Rhode Island. 491 open bids in Rhode Island — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Oct 9, 2026 | ID: 103112720

Open Facilities & Maintenance Bids in Rhode Island

RICityOpenOct 26, 2026
Town Hall Bell Tower Roof Replacement
South Kingstown · #SK0030FAC
Facilities & Maintenance
RISchoolOpenNov 3, 2026
Media Centerer Carpet
South Kingstown Public Schools · #2476
Facilities & Maintenance
RICityOpenNov 3, 2026
Media Centerer Carpet
Cumberland
Facilities & Maintenance
RICityOpenNov 9, 2026
Town Hall Bell Tower Roof Replacement
Coventry
Facilities & Maintenance