Work under this Contract consists of civil, sitework, mechanical, structural, electrical, instrumentation and all related work necessary to repair the failed 16-inch diameter 90-degree elbow joint and pipe segment on the return sludge line (ductile iron pipe) located below grade within the 48-inch diameter influent line at Clarifier No. 3. In addition, this work includes all construction sequencing requirements, all startup and training activities, and all other work required for a complete and operating facility. At the City’s option, if deemed necessary, the work may also include complete replacement of the mechanism, fiberglass v-notched weirs, scum baffles, and/or density current baffles at Clarifier No. 3. Due to the location of the repair, this work includes dismantling, relocating/protecting and re-installing existing clarifier mechanism equipment (as necessary) once repair work is completed and deemed acceptable by the City
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today