Citywide Signalized Intersection ADA Upgrades, Phase 3a

CAMontereycityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
84682
Open Date
Mar 8, 2024
Close Date
--
Status
Closed

Description

In general, the work consists of, but is not limited to, reconstruction of three intersections, construction of drainage improvements, striping and signage, and traffic signal and street lighting work.  This work shall include, but not be limited to, demolition of existing pavement and curb, gutter, and sidewalk, construction of catch basins, installation of storm drain pipe, manholes, construction of curb and gutter, sidewalk, HMA and PCC paving, HMA overlay, striping and signage, and traffic signal and street lighting improvements.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Apr 27, 2026 | ID: 293186

Open Construction Bids in California

CAStateOpenTODAY
Ground Transportation Car Wash Design-Build Replacement. Travis AFB, CA
BidNet Direct - California
Construction
CAStateOpenTODAY
2026 Sanitary Sewer and Storm Drain Rehabilitation Project
BidNet Direct - California
Construction
CACityOpenTODAY
Water Treatment Plant Filter Unit Rehabilitation 2026
Shasta Lake · #2026-06
Construction
CACountyOpenTODAY
Cap 41c2408 Marin County Jail Cell Improvements & Related Work
Marin County · #41C2408
Construction