The work consists of rehabilitation of The City of Stuart Water Reclamation Facility headworks structure, including installation of a temporary headworks bypass system, removal of the second-floor enclosed roof structure, detailed structural condition assessment and minor repairs to influent channels and gates, installation of a new steel canopy, modifications to the existing odor control system, and associated electrical improvements.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today