Replace the fill media in the Marley NC Series Cooling Tower, located on the 8th floor of City Hall. Isolate and drain the cooling tower, remove and replace the galvanized panels, install new fill media, water nozzles, and change the gearbox oil along with replacing the pinion seals. Reconnect all systems, perform necessary maintenance, and conduct a final inspection to ensure the tower is operational and leak-free.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today