The work includes the rehabilitation of an estimated 19,060 feet of the existing 6-inch to 15-inch wastewater pipelines with cured-in-place pipe (CIPP) lining, including installation of a temporary sewage bypass pumps and piping system (above ground), safety measures, traffic control, and all appurtenant work. The work also includes the installation of service lateral connections (SLC) at selected locations, as well as the rehabilitation of 84 maintenance holes with polyurethane lining.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,939 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today