Church St Tunnel Girder Repair

CTNew HavencityConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
152114
Open Date
Mar 5, 2025
Close Date
--
Status
Closed

Description

Removal and replacement of girders, corbels, and masonry walls within the Church St Tunnel. The tunnel will be closed to typical traffic circulation during construction. The supported slab (tunnel ceiling) will need to be shored to continue carrying live, dead, and construction loads for the full duration of the project. Contractors will be allowed a 12 week closure of the portion of the tunnel within the project limits for shoring activities.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Connecticut. 1,444 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added May 1, 2026 | ID: 4158625

Open Construction Bids in Connecticut

CTStateOpenTODAY
Meadow Street Park Renovation
State of Connecticut (CTsource) · #4527
Construction
CTStateOpenTODAY
Environmental Engineering Services On Call
State of Connecticut (CTsource) · #PLV RFQ 2027-04E
Construction
CTStateOpenTODAY
Meadow Street Park Renovation
BidNet Direct - Connecticut
Construction
CTStateOpenTODAY
Concrete Stair Replacement Lebanon Elementary
State of Connecticut (CTsource) · #38027
Construction