The COUNTY wishes to proceed with design of surface facilities necessary to collect surface water, treat that water to meet regulatory requirements, and route water to the existing aquifer storage and recovery (ASR) and the managed aquifer recharge (MAR) well, with a potential bypass to directly feed the treated water to the North County Reclaimed Water System (NCRWS). Of note, construction of the MAR well will be ongoing during the beginning stages of this project and should completed in 2027.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Florida. 2,273 open bids in Florida — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today