General work description: The work consists of clearing, grubbing and environmental protection, installing concrete curb ramps, curb and gutter, sidewalk, valley gutter, sidewalk curb drains, removing and resetting existing sign posts, hot-mix asphalt plug (8-inch depth), removal of City tree, and striping construction located at the intersection of Eucalyptus Ave/Almond Ave, Eucalyptus Ave/Cottonwood Ave, Eucalyptus Ave/Palm Ave, Spruce Ave/Third Ln, Walnut Ave/Tamarack Ln, Hawthorne Pl/California Ave, and Olive Ave/Armour Ave in South San Francisco, CA 94080 as shown in the project plans.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today