CCC-078 Administration Renovation Addendum No. 1

CACompton Collegecommunity collegeConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
CCC-077
Open Date
--
Close Date
--
Status
Open

Description

Date: AUGUST 10, 2023 ADDENDUM NO. 1 To Project Bidding Documents for: RFQ CCC-078 A#03-119689 Administration Building Renovation Compton Community College District tBP Project. No. 20987.00 tBP/ARCHITECTURE 4611 Teller Avenue Newport Beach, CA 92660 (949) 673-0300 TO: PROSPECTIVE BIDDERS This Addendum forms a part of the Contract Documents and modifies the original approved Bidding Drawings. Acknowledge receipt of this Addendum in space provided on the Bid Form. Failure to acknowledge may subject Bidder to disqualification. This addendum revision includes:      Bidding RFC Responses Scope of Work description. DSA_103, Required Structural Tests & Special Inspections Revised Table of Content & Specifications Revised Full-Size Sheets. A Bidding RFC’s responses. B. Scope of Work Description C. DSA _103 List of required Structural Tests & Special Inspections 2016 CBC D. Revised Specifications Revised table of Content. Replace the old Table of Content by new Addendum 1 Table of Content showing revised and omitted sections, included as part of this addendum. Specification 080800 800 Glazing: Replace the old specification with a new 0800 Included as part of this addendum. Addendum 1 Glazing Spec section 080800. E. Revised Drawings: 1. Revised SHEET AS-2 SITE DETAILS AND ACCESSIBLE PARKING a. Included repair and slurry of asphalt area where new ADA parking is re- ADMINISTRATION BUILDING RENOVATION COMPTON COMMUNITY COLLEGE ADDENDUM NO. 1 Page 1 of 8 b. c. 2. Revised SHEET A0-1 FLOOR PLANS DEMOLITION. a. b. c. d. e. f. g. h. i. 3. e. f. Corrected general notes to clarify ambiguous scope notes. Added ceiling demo scope where walls are removed in Restrooms. Added the demolition of the original building phone booths. Identified and noted area of new access panels for fire alarm upgrade to President’s office area. Clarified ceiling to be removed at Women’s Lounge room. Reworded demo notes 1, 5 and 7. See attached revised Full size sheet identifying revisions included as part of this addendum. Revised SHEET A0-3 ROOF PLAN DEMOLITION a. b. 5. Corrected general notes to clarify ambiguous scope notes. Include the replacement of two existing damaged exterior doors in the Electrical room and Storage room. Included the replacement of a wood window systems affected by termites.at the east side of the building.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 4,950 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42108294