CC Dam Relief Well System - Video Inspection & Pump Testing

TXTarrant Regional Water Districtwater sewerConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
109621
Open Date
Aug 7, 2024
Close Date
--
Status
Closed

Description

TRWD owns and maintains a relief well and drainage collection system downstream of the Joe B. Hogsett Dam at Cedar Creek Reservoir. The relief well and drainage collection system consists of a total of 76 relief wells with related discharge pipes and control ball valves along dam downstream toe berm as seen in Figure 1. There are two pump stations in the middle that divide the relief wells into west and east sections. The west section contains 44 wells 101 through 139 with additional 131.5, 132.5, 133.5, 134.5, 135.5 between 131 and 136. The east side contains 32 wells 140 through 171. The depth of relief wells ranges from 50 to 65 feet. The static water depth ranges from 2 to 23 feet. Each relief well has a concrete pad and a manhole cover. Figure 1: Site Plan  

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in Texas. 3,624 open bids in Texas — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42363354

Open Construction Bids in Texas

TXstate_agencyOpenTODAY
Clements Unit - Construction Manager at Risk for BOQ
Texas Department of Criminal Justice · #RFSQ-US.227527
Construction