TOWN OF LITCHFIELD ROADWAY RECONSTRUCTION CAMPVILLE ROAD STATE PROJECT No. 0073-0198 LOCATION OF PROJECT FEDERAL AID PROJECT No. 1073(109) LOCATION OF PROJECT TO BE MAINTAINED BY THE TOWN OF LITCHFIELD FROM STA 102+89.1 TO STA 125+75 LENGTH = 2285.9 LF D IEL N F O H ITC AST L M OF THO N F W TO WN O TO FUNCTIONAL CLASSIFICATION OF CAMPVILLE ROAD: RURAL MINOR COLLECTOR DESIGN SPEED: 30 mph POSTED SPEED LIMIT: 30 mph CONSTRUCTION SPECIFICATIONS: STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROADS, BRIDGES, FACILITIES AND INCIDENTAL CONSTRUCTION, FORM 819 2024, JULY 2025 SUPPLEMENTAL SPECIFICATIONS. FIRST SELECTMAN NTS NOT TO SCALE DESIGN DATA SCALES: AS NOTED PROJECT LOCATION PLAN PROJECT VICINITY MAP HORIZONTAL DATUM: ASSUMED DATUM VERTICAL DATUM: ASSUMED DATUM DENISE RAAP PUBLIC WORKS DIRECTOR AND TOWN ENGINEER RAZ ALEXE, P.E. NOVEMBER 19, 2025 LIST OF DRAWINGS SHEET NO. LIST OF DRAWING REVISIONS SHEET NO. - DESCRIPTION - DATE BY TITLE DRAWING SHEET NO. STANDARD DRAWINGS FHWA APPROVAL DATE 1 TITLE SHEET TITLE HW-910_17 R-B TERMINAL SECTION 11-08-22 2 GENERAL NOTES & TYPICAL SECTION GEN-01 HW-910_20 MASH W-BEAM HARDWARE 10-18-24 3 MISCELLANEOUS GRADING PLAN GRA-02 HW-910_21 METAL BEAM RAIL (R-B MASH) GUIDERAIL 01-04-24 4-6 ROADWAY PLAN AND PROFILE PLA-01 TO PLA-03 HW-910_25a METAL BEAM RAIL TRANSITION 350 TO MASH GUIDERAIL 10-18-24 7-21 CROSS SECTIONS XSC-01 TO XSC-15 TR-1208_02 METAL SIGN POSTS AND SIGN MOUNTING DETAILS 6-15-17 22 MISCELLANEOUS DETAILS MDS-01 TR-1210_08 PAVEMENT MARKINGS FOR NON FREEWAYS 8-21-18 DESIGNED BY: CARDINAL ENGINEERING ASSOCIATES, INC. JOSEPH A. CERMOLA III, P.E. TITLE_FD BID DOCUMENTS 1 ANY PHYSICAL FEATURES DISTURBED BY THE CONTRACTOR SHALL BE REPLACED OR RECONSTRUCTED AS DIRECTED BY THE ENGINEER TO A CONDITION EQUAL TO OR BETTER THAN PRIOR TO CONSTRUCTION AT THE CONTRACTORS EXPENSE. 5. ALL DIMENSIONS AND ELEVATIONS MUST BE VERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO THE START OF MANUFACTURING AND CONSTRUCTION, AND NECESSARY ADJUSTMENTS MADE AS ORDERED BY THE ENGINEER. 6. THE CONTRACTOR'S ACTIVITIES ON SITE SHALL BE LIMITED TO OPERATIONS BETWEEN 7:00 A.M. TO 5:00 P.M., MONDAY THROUGH FRIDAY EXCEPT LEGAL HOLIDAYS. 7. 8. 9. THE CONTRACTOR SHALL SUBMIT A DETAILED SCHEDULE FOR APPROVAL PRIOR TO COMMENCING CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ACCESS TO ALL PROPERTIES AT ALL TIMES DURING CONSTRUCTION.
Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,535 open bids in Connecticut — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today