Westmoreland County Community College BIC HVAC – Air Handler Replacement WCCC Project No. 1041 RVE Project No. P186X002 February 14, 2025 DOCUMENT 00 0102 – TABLE OF CONTENTS Pages DIVISION 01 - GENERAL REQUIREMENTS 012500 012600 013100 013200 013300 014000 014200 016000 017300 017419 017700 017823 017839 017900 Substitution Procedures Contract Modifications Project Management and Coordination Construction Progress Documentation Submittal Procedures Quality Requirements References Product Requirements Execution Construction Waste Management and Disposal Closeout Procedures Operation and Maintenance Data Project Record Documents Demonstration and Training 3 3 8 4 7 6 4 7 9 4 4 8 5 5 Common Work Results for HVAC General-Duty Valves for HVAC Testing, Adjusting, and Balancing for HVAC HVAC Insulation Sequence of Operations for HVAC Controls Hydronic Piping Hydronic Piping Specialties Refrigerant Piping Metal Ducts Air Duct Accessories Air Diffusers Packaged Compressor and Condensing Units Indoor, Air Handling Unit 3 4 11 20 3 3 4 7 7 8 2 5 7 DIVISION 23 - HVAC 230500 230523 230593 230700 230993 232113 232116 232300 233113 233300 233713 236200 237313 END OF DOCUMENT 00 0 Table of Contents 00 0102- 1 Westmoreland County Community College BIC HVAC – Air Handler Replacement WCCC Project No. 1041 RVE Project No. P186X002 February 14, 2025 SECTION 01 2500 - SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 A. 1.2 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section. SUMMARY A. Section includes administrative and procedural requirements for substitutions. B. Related Requirements: 1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers. 1.3 A. DEFINITIONS Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents. 1. 2. 1.4 A. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required to meet other Project requirements but may offer advantage to Contractor or Owner.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in Pennsylvania. 1,672 open bids in Pennsylvania — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today