Bids will be received for a single prime contract for providing all material, labor, and equipment necessary to complete the Branciforte Creek Streambank Restoration project. Works shall include, but not be limited to: mobilization, traffic control, water pollution control, clearing and grubbing, sheet pile retaining wall, excavation, temporary stockpile, grout backfill, rock slope protection embankment infilled with soil, minor grading, compacted fill, hydroseed, and plantings.
Unlock the source link for this bid, plus email alerts when similar Other bids open in California. 4,840 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today