The main purpose of the project is to improve the drainage system on roads and private properties to mitigate chronic flooding issues. This project is Phase 1 and consists of drainage improvements from structure S#1 to structure S#6 only. The work includes demolition/removal of trees, fences and pavement and the installation of new storm drainage lines and catch basins. Site stabilization shall include fine grading and grassing of all disturbed areas. The County shall provide staking for the new storm drainage system including alignments and elevations, therefore, a line item for construction staking is not included in the bid schedule.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in South Carolina. 1,748 open bids in South Carolina — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today