Bid No. 25-11 Nipomo High School Concrete Pathway; Project No. 0560

CALucia Mar UnifiedschoolConstruction
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
25-11
Open Date
--
Close Date
--
Status
Open

Description

3 2 4 6 1 4/11/25 02:23 PM JennaWagner 5 1. Remove curb and gutter. Replace with rolled curb and gutter per City of Pismo Beach detail 107. 2. Remove existing driveway approach 3. Install sidewalk/commercial driveway combination. Rebar and concrete thickness per San Luis Obispo County Detail B-3a. 6' walk only - Apron not required behind a rolled curb. 4. Install ADA Ramp per Caltrans detail A88A Case C 5. Install ADA Ramp per Caltrans detail A88A Case G 6. Relocate gates beyond the ADA ramps. 1 r 1'- 6" 2' 1- 1/ 2" I III R= 1/ 4" R= 1- 1/ 2"— 5„ 4 R= 1/ 4" 1 1 d d a- JI 6 d °° R= 1" 6l" 1 7l 3'- 7" GENERAL NOTES: A. Transition to standard curb at all curb returns, except where sidewalk ramps are provided, drainage and at all cul- de- sacs with structures. B. Concrete shall conform to State Standard 90- 1. 10, 5- sack portland cement concrete unless otherwise approved by the City Engineer. Concrete curing shall be by pigmented curing compound method using white pigment type unless otherwise approved by the City Engineer. C. 6" minimum Class II aggregate base to 95% relative compaction or match base thickness requirement for new or existing road section, whichever is greatest. D. Face of curb shall be marked with an " S" ( sewer), " W" ( water), or" G" ( gas) directly over all laterals and/ or services unless otherwise marked to the satisfaction of the City Engineer. The mark shall be stamped into the concrete and shall not be smaller then 3" x 2" nor less than 3/ 16" deep. E. Expansion joints shall be constructed at all corners, storm drain inlets, beginning of curves, end of curves, driveways, and at 30' intervals with 1/ 4" expansion material and 1/ 2" 0 x 18" smooth dowels, greased or sleeved at one end. Weakened plane joints ( WPJ) shall be placed at 10' intervals and shall be 1- 1/ 2" deep. To the extent practicable joints shall match those on existing structures adjacent to the new curb. Curb construction adjacent to existing asphalt paving shall include sawcutting, removal and replacement. G. Utility lids and concrete collars shall not be located within the top of curb. OA G di BY REVISIONS APP DATE CURB AND GUTTER i1111 Va V 40 concrete F.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Construction bids open in California. 5,013 open bids in California — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42113213

Open Construction Bids in California

CAStateOpenOct 26, 2026
143 Triunfo Canyon Road-Tenant Improvements
BidNet Direct - California
Construction
CAStateOpenOct 26, 2026
Building permit application plan review
BidNet Direct - California
Construction
CACityOpenOct 26, 2026
San Luis Rey Park Restroom Rehabilitation
San Clemente
Construction