ADDENDUM # 01 Project: DSA #: Bid #: Lucia Mar Unified School District Nipomo High School HVAC Replacement 19six #: 22174.01 03-123429 File #: 40-39 TBD Date: May 23, 2024 To all bidders submitting proposals for the above captioned project. This Addendum is hereby included in the Contract Documents to the same extent as though it were originally included therein. The following items modify, add to, delete from, or explain the drawings and/or specifications. The contents of this Addendum shall take precedence over the original specifications and plans. PRE-BID RFI’s & CLARIFICATIONS: Item #1: Pre-Bid RFI #01: See attached RFI and response. ATTACHMENTS: RFI 01 SPECIFICATIONS None DRAWINGS None _______________________________________________ Alan Kroeker C-22474 Lucia Mar Unified School District Nipomo High School – HVAC Replacement Project Specification 19six Project No. 22174.01 SECTION 01 30 00 Request for Information Form REQUEST FOR INTERPRETATION (RFI) Project: Nipomo HS HVAC Project Project No: 1 Date: 5-8-24 0594 To: Paul Scorby From: RFI No: Smith MEP Subject: Existing Piping Demo Discipline: Category Specification Section Title: Section Number: Sheet Number: Page: M3.3 Article/Paragraph: Detail: Question: During the site walk on 5-7-24 direction on the piping demo was to remove everything in attics etc. and cap where piping goes underground. Looking at sheet M3.3 demo note 1 it states drain piping and abandon in place. Please clarify the demo extent of the piping. Suggestion: Attachment: Undersigned certifies: Both drawings and specification sections were thoroughly reviewed. Processing time for frivolous RFIs will be charged back to Contractors at A/E billable rates. REQUEST FOR INFORMATION FORM 01 30 00 - 1 Lucia Mar Unified School District Nipomo High School – HVAC Replacement Project Specification Desired Response Date: 5-10-24 Cost Impact: 19six Project No. 22174.01 (However, A/E still have specified days to respond.) $ TBD Schedule Impact: Drawing Impact: Submitted by: Signed: Date: days Answer: Clarification on piping demo scope: contractor shall remove piping located above T-bar ceilings. Piping located above hard lid or in inaccessible areas shall be drained and abandoned in place as called out on the mechanical drawings. R. Reed BMA Mechanical 05-23-24 Answered by: Signed: Copies: Date: Owner Consultants Contractor IOR File 1.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in California. 5,008 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today