GGUSD Fencing Project # 3, Bid # 2211 ADDENDUM NO. 1 Date: May 10, 2023 Owner: Garden Grove Unified School District 10331 Stanford Avenue Garden Grove, California 92840-6353 The clarifications, modifications, changes, additions, and/or deletions contained herein shall be incorporated within the construction documents for the project. Such information shall take precedence over that previously published. Responses shall be considered modifications to the contract hereby incorporated into the contract documents as established above. CHANGES TO CONTRACT DOCUMENTS: 1) REVISE MORNINGSIDE ES AMERISTAR FENCING SCOPE OF WORK PER THE ATTACHED REVISED AERIAL. 2) PROVDE AND INSTALL HURRICANE MANUFACTURING COMPANY PRIVACY SLATS INSTALLED BETWEEN THE TOP AND BOTTOM RAILS AT THE KINDER AREAS ONLY. THE SLAT COLOR SHALL BE BLACK. SLATS WILL BE INSTALLED ON THE FENCING THAT IS STREET FACING ONLY. MORNINGSIDE ES: +/- 145 LINEAR FEET OF PRIVACY SLATS NEWHOPE ES: +/- 70 LINEAR FEET OF PRIVACY SLATS WARREN ES: +/- 150 LINEAR FEET OF PRIVACY SLATS QUESTIONS AND CLARIFICATIONS: None ATTACHMENTS: 1 8x11.5 page, revised Morningside aerial. END OF ADDENDUM NO. 1 Morningside Elementary School Fencing Project Addendum # 1 Aerial Remove and replace existing chain link fencing and gates and replace with Ameristar fencing and vinyl coated chain link fencing per plans and specifications. Remove existing chain link fencing and posts at trash enclosure and replace with vinyl coated chain ink fencing and gates to match existing.
Unlock the source link for this bid, plus email alerts when similar Facilities & Maintenance bids open in California. 5,013 open bids in California — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today