BIDDER'S PACKAGE (AB788) Scope of Work The work to be completed hereunder includes the furnishing of all supervision, labor, materials, machinery, tools, supplies, equipment, services and appurtenances including utilities and transportation necessary for the complete and satisfactory demolition of property located at: Project Number & Address Work on this property is described in Appendix: AB788 2308 Robert C Byrd Dr, Beckley Demolition and removal of a single-widel residence. Asbestos Transite Siding is present (refer to attached asbestos inspection report). Owner has requested to leave portions of the block wall to line up with the chain-link fence, and to leave other block retaining walls (if stable) Owner has requested to not damage live trees than are greater than 10" diam. at chest height This work consists of the complete removal of such buildings and appurtenances as are specifically designated to be cleared as specified by the Performance Requirements hereinafter prescribed. Performance Requirements for this Work (Additional remarks for Project Number are indicated in bold type face): 1) Public Rights-of-Way. The CONTRACTOR shall keep public rights-of-way leading to and adjacent to the project area reasonably clear at all times. Where needed, CONTRACTOR shall provide traffic control (i.e., personnel for flagging & any needed permits) to maintain the flow of traffic on these public rights-of-way. 2) Protection of Public Property. (Streets, Utility Meters, Mains, Etc.) from damage by the CONTRACTOR's equipment. 3) Disconnection of Utilities. Gas lines, electrical lines, tele-cable lines, water lines, and sewer lines located and disconnected and capped as necessary. Notification of gas and electric companies for utility removal. Disconnect and cap all utility lines, including electric, gas, water, and sewer. The CONTRACTOR is responsible for contacting utility providers, and utility providers staff must inspect all lines after completion. Failure to comply with this requirement shall render the CONTRACTOR liable for any and all AB788 Page 1 of 6 damages or costs incurred by utility providers. Note: CONTRACTOR must notify Public Service Districts (e.g. Beckley Sanitary Board) before demolition and during demolition to confirm all sanitary and water infrastructure has been properly protected for the demolition. All remaining sanitary lines and water lines must be protected and stubbed off to their specifications.
Unlock the source link for this bid, plus email alerts when similar Other bids open in West Virginia. 389 open bids in West Virginia — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today