Alabama Port Authority Project Name McDuffie Terminal Improvements – New Assembly and Shop Buildings Location Mobile, Alabama Project # 11411 Task # 3 March 11, 2026 Addendum 2 1|P a g e ADDENDUM NO. 2 Item Description Effective March 9, 2026, the Port’s legal name has been changed to Alabama Port Authority. The name change bill, Act 2026-217, was signed by the Governor on March 9, 2026, officially establishing the name change. Moving forward all official documents will use the name Alabama Port Authority, or reference “the Alabama Port Authority, formerly known as the Alabama State Port Authority.” DIVISION I – BID DOCUMENTS No additions DIVISION II – CONTRACT DOCUMENTS No additions DIVISION III – SPECIAL PROVISIONS No additions DIVISION IV – GENERAL PROVISIONS No additions DIVISION V – CONSTRUCTION SPECIFICATIONS 1 Paragraph 7.1, page V-43 should read as follows: Boring logs from the site geotechnical investigation are included in the drawings and are provided as a reference to the CONTRACTOR. The subsurface and groundwater conditions shown are reported as observed during the sampling phase of the investigation. The soils information given is intended to provide an indication of the conditions that will be encountered but cannot be given as a guarantee. Alabama Port Authority Project Name McDuffie Terminal Improvements – New Assembly and Shop Buildings Location Mobile, Alabama Project # Item 11411 Task # 3 March 11, 2026 Description NOTES 2 3 Revised Drawings (attached) Drawing No. 4617 E1 Drawing No. 4617 E2 Contractor Questions (attached) Addendum 2 2|P a g e PORT SERVICES, LLC PORT SERVICES, LLC
Unlock the source link for this bid, plus email alerts when similar Other bids open in Alabama. 803 open bids in Alabama — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today