Bid # 27 001 Addendum 2 pdf

CTWeston School DistrictschoolOther
Unlock Official Bid Documents — Free 7-Day Trial
Bid Number
27
Open Date
--
Close Date
--
Status
Open

Description

Addendum # 2 Bid 27-001 BOE – Central Office HVAC Replacement We are moving the deadline for the bid due date to July 8th. 1. Who will be responsible for the control removal, reinstallation, and integration? At the walkthrough it appears ABS has the ATC’s in the building. The scope does not call out for any controls work currently. ABS 2. The scope of work “Add Option 2: AHU Hot Water Coil.” Are we to reconnect the HWC to the existing HW S&R piping? The existing coils have been disconnected and capped. I am unable to get an answer for this, as the person I need to speak to is out of the office. Please price it out both ways, reconnecting to existing piping and not.

Official Source Link

Unlock the source link for this bid, plus email alerts when similar Other bids open in Connecticut. 1,451 open bids in Connecticut — see them all with your trial.

Unlock with a 7-day free trial

$49/mo after · cancel anytime

Card required · $0 today

Added Jul 6, 2026 | ID: 42128171

Open Other Bids in Connecticut

CTStateOpenTODAY
Norwalk City Hall EV Station Project
BidNet Direct - Connecticut
Other
CTStateOpenTODAY
Snow Plowing Services - Citywide
BidNet Direct - Connecticut
Other
CTStateOpenTODAY
New Band Instruments for NPS Elementary Schools
BidNet Direct - Connecticut
Other
CTStateOpenTODAY
Snow Plowing And/Or Heavy Duty Snow Removal With Wheel Loaders 2026-2027
State of Connecticut (CTsource) · #RFQ 8956- Wtby
Other