Estimated Project Cost: $1,550,000 - $1,750,000 Contract Working Days: 100 This project is to construct both Bemis Street and Sybel Lane to upgrade them from gravel streets to paved streets with curb, gutter, sidewalks, storm drainage, street lighting, and upgraded 8-inch PVC water main and side services. The project also includes paving 175 feet of Milwaukee Avenue to connect existing pavement to Broadway Avenue to reduce gravel road maintenance. The work is scheduled to begin in Spring by April 2027 and includes replacing the old 6-inch AC water main with 1,550 LF of 8-inch PVC, 32 new water service connections, 1,200 tons of CSTC, 2,400 tons of CSBC, 1,200 tons of HMA, 6 catch basins, 2 drywells, 140 LF of 8-inch storm sewer pipe, 3,400 LF of curb and gutter, 2,720 SY of cement concrete, preparation for 6 new PUD street lights (including foundation work, 1,700 LF of 2-inch PVC conduit, and electrical junction boxes), utility casting adjustments, and 3 new 4-inch PVC sewer connections.
Unlock the source link for this bid, plus email alerts when similar Construction bids open in Washington. 1,471 open bids in Washington — see them all with your trial.
Unlock with a 7-day free trial$49/mo after · cancel anytime
Card required · $0 today